|
Projects> IOW
Cross Solent Issues
IOW Cross Solent Issues
<< Go
Back
The study investigated the existing/future demands for cross Solent
travel capacity both ferry and shore-side and the ability of the
Isle of Wight highway network to cope with peak demands for travel
particularly during the peak tourist season. The study investigated
the capacity and existing operation of the floating bridge at Cowes
and ferry terminals at Yarmouth, Cowes, Fishbourne and Ryde. The
study also included capacity and impacts of public transport interchange
facilities, cross Solent freight movements, trailer storage capacity
at the docks and review of the feasibility of a bulk freight distribution
site on the Isle of Wight.
|